Client results/ named, with permission
Haldiram’s. Bharatiyam.
Chettinad Cement.
Three industrial groups have agreed to share their work with us: the baseline, what was built, and what was measured. Each case study is published to the standard below — every figure marked metered, invoiced or modelled.
Case studies
Haldiram's
RE-100 study: about 35 MW sized across 8 plants in Uttar Pradesh.
Full case study comingBharatiyam
RE-100 study: about 19 MW sized across 2 plants in Uttar Pradesh, Odisha.
Full case study comingbhrtym.com ↗Chettinad Cement
RE-100 study: about 200 MW sized across 3 plants in Tamil Nadu, Karnataka, Andhra Pradesh.
Full case study comingThree things/ that are not the same
Playbook, scenario,
result.
Most industrial energy marketing blurs these three together. We keep them apart, on this site and in every document we send you.
Sector playbook
The typical opportunities and engineering approach for a sector — where the heat goes, what a heat pump can take, what stays on fuel. This is what the five industry pages are. It describes an approach, not a plant.
Illustrative scenario
A modelled outcome with its assumptions stated: the worked journey, the studio figures, the economics tables. Internally consistent and defensible, but a model. Every one of them carries its assumptions with it.
Client result
A documented engagement with measured outcomes and written permission to publish. Different in kind from the other two, and the only one we would ever call proof.
When we publish one/ what it will contain
What you should
demand of it.
Hold us to this list — and hold anyone else pitching you to it too. A case study missing the baseline or the measurement period is a brochure.
What was measured before anything changed, over what period, and how.
What was in the engagement, what jouleWise delivered directly, and what partners delivered.
What was actually built or contracted, at what scale.
When it ran, and over how long the outcome was measured.
How the outcome was established — metered, invoiced or modelled — with forecast savings kept separate from measured ones.
What the result depends on, and what would make it not repeat at your site.
What we can show/ study mandates
Whose plants
we have sized.
These are RE-100 study assignments: the capacity we sized and modelled, under each state’s open access regime, for named industrial groups. They are listed here because they are real and checkable. They are not results, and the table does not pretend otherwise.
In short/ Client results
jouleWise's client results page names Haldiram's, Bharatiyam (Campa bottler) and Chettinad Cement, whose case studies are being published to a stated evidence standard, alongside the RE-100 study mandates on record.
Each case study states the baseline, jouleWise's scope and partners' roles, what was built, the period, and every outcome marked metered, invoiced or modelled, with written permission to publish. Until a case study's data is complete, the page shows the client's RE-100 study scope already on record: capacity sized and modelled, never capacity built.
Start/ one plant
Your plant,
next on this page.
A four-week baseline gives you a metered position and a business case — measured the same way as the case studies above.