jouleWise

Food & Beverages/ electricity · heat · proof

Chill it, heat it —
on the same kWh.

One provider for green electricity, green heat and the data that proves both — from source water to CIP to the last case on the truck.

Electricity · Punjab20% lower

About ₹5.92 a unit across the year with solar and wind, against ₹7.41 from the grid.

Heat · COP 3.6₹1.37 / kWh

Heat from a heat pump on that electricity, against ₹6.22 from a PNG boiler.

Start4 weeks

An energy assessment on your bills and metering, then one business case for electricity and heat.

Why nowBrand-owner targets · Plastic EPR · Water · Energy cost · Disclosure · Carbon markets

Illustrative reference plant; your figures come from your own tariff, fuel and load.

ELECTRICITYGREEN SUPPLYHEATHEAT PUMPSDATAergOSESGesgOS

Source water to shelf/ where we intervene

Every litre
has a lever.

Water is treated, syrup is made, bottles are washed, filled, pasteurised and chilled, and cases leave for the market. jouleWise acts at eleven points across the plant.

0102040305060708091011
ElectricityHeatData · ergOSESG · esgOS
01

Green sourcing

Intrastate and ISTS solar and wind contracted through open access for a long-shift load with summer peaks.

Electricity
02

Connectivity and metering

Open access approvals, connection agreement and ABT metering at the plant incomer.

Electricity
03

Rooftop solar

Bottling hall and warehouse roofs carry behind-the-meter solar, sized from measured load.

Electricity
04

Battery storage

LFP storage shaves the blow-moulding and chiller peak and carries solar into the evening shift.

Electricity
05

Heat pumps on CIP and syrup

CIP, syrup dissolving and process hot water from heat pumps instead of boiler steam.

Heat
06

Pasteuriser and bottle washer

Tunnel pasteuriser zones and washer baths on the heat pump hot-water circuit.

Heat
07

CIP and hot-water store

Store charged in solar blocks, ready for every CIP cycle and changeover.

Heat
08

Chiller heat recovery

Carbonation and process-chiller heat becomes the heat pump source — chilling and hot water from one kWh.

Heat
09

ergOS control

15-minute metering of electricity, heat, chilled water, fuel and water — per line where it matters.

Data · ergOS
10

Outbound and packaging

Carbon per litre and per case, plastic EPR returns and recycled-content tracking from esgOS.

ESG · esgOS
11

Source water

Water withdrawal by source, water-use ratio and groundwater compliance, metered and reported.

ESG · esgOS

Illustrative plant. Actual intervention map built site by site in the baseline.

Electricity/ plan · implement · meter · orchestrate

Low-cost
green electricity.

Blow moulders, compressors, chillers and filling lines run long shifts with a daytime peak — and demand climbs steeply in summer. We build the green portfolio to that profile and move heat pump load into solar hours.

Every source, one dispatch. Intrastate and ISTS solar and wind, rooftop solar, BESS and green-market purchase — each source orchestrated to fulfil industrial demand at least cost.
000612182424 HOURS · 96 BLOCKS · ILLUSTRATIVEHEAT PUMPS · CIP, WASHING, PASTEURISERSOLARWIND · ISTSBESSGREEN MARKETFACTORY + HEAT PUMPS
Wind · ISTSSolarBESSGreen marketHeat pump load

Hover the profile to read any 15-minute block

Heat pumps run all day here: CIP and washer water at every changeover, the pasteuriser through both shifts, the hot-water store charged in solar hours. Chillers carry on through the night, which is why the base never falls far.

01

Plan

Meter-data due diligence: bills, load survey, rooftop and captive parameters. Solar, wind, hybrid, BESS and exchange electricity optimised together, capex or opex, with each state's ToD, banking and open access charges in the landed-cost model.

RE-100 roadmap · size, location, savings, NPV
02

Implement

RfP over a 25-year horizon, developer evaluation, reverse auction, PPA and shareholder agreements (26% SPV equity for captive status), open access approvals and connection agreement.

Green electricity contracted · ~3 months once planning closes
03

Meter and log

ABT meters at injection and drawal points — main and check meters on CTs and PTs of the required accuracy class — plus data loggers on every incomer, heat pump, steam, fuel and water line. Installed, tested, sealed and linked to the SLDC and to ergOS.

Every source and load visible in 15-minute blocks
04

Orchestrate

ergOS forecasts 96 blocks, schedules with the SLDC, trades DAM, GDAM, RTM and GTAM, manages banking and battery health — and now dispatches heat pumps and thermal storage against price.

For the life of the assets

Heat/ what moves, what stays

The boiler,
reinvented.

Almost every heat duty in a beverage plant sits below 100 °C: CIP, washing, syrup and pasteurisation. Heat pumps serve them on electricity — and the chillers cooling the product supply the heat.

Bottle washingreturnable glass, caustic baths
CIP of syrup and filler lineshot caustic and rinse
Syrup dissolvingsugar and ingredients
Tunnel pasteurisationpacked product
Hot fill and flash pasteurisationjuices, teas, dairy drinks
Crate and case washingreturnable logistics
UHT processingremains on existing steam
0 °C50100120150200 °C
Heat pump rangeStays on existing burners or electrode heat120 °C ceiling

Heat sources we reuse

Carbonation, process and cold-room chiller condensers, compressor heat and warm rinse water — heat the plant already rejects every hour it runs.

Heating and cooling at once

Beverage plants chill product while heating CIP and wash water. A heat pump on the chiller loop serves both from the same kWh.

Sized from metered heat

Portable heat meters log flow and temperature on candidate processes for two to four weeks before anything is sized.

Economics/ illustrative

Low-cost electricity
drives low-cost heat.

What one kWh of useful process heat costs, and what it emits, depending on where the heat comes from. The heat pump cuts cost on any electricity; green electricity is what cuts the carbon.

Source of heat
₹ per kWh of useful heat
₹/kWh-th
PNG-fired boiler₹55/SCM · 85% efficiency
6.22
Diesel (HSD) boiler₹90/L · 85% efficiency
10.59
Heat pump on DISCOM electricity₹8.5/kWh · COP 3.6
2.36
Heat pump on green open access₹5.5/kWh landed · COP 3.6
1.53
Heat pump in solar blocks + store₹4.0/kWh · COP 3.6
1.11
Source of heat
kg CO₂ per kWh of useful heat
kg/kWh-th
PNG-fired boiler
0.22
Diesel (HSD) boiler
0.32
Heat pump on DISCOM electricity
0.20
Heat pump on green open access
≈ 0
Heat pump in solar blocks + store
≈ 0

Illustrative only, not an offer. Assumptions: PNG 10.4 kWh/SCM, 1.95 kg CO₂/SCM; HSD 10.0 kWh/L, 2.68 kg CO₂/L; grid 0.716 kg CO₂/kWh (CEA baseline order of magnitude); green electricity treated as zero-emission on a market basis with green attributes retired. Heat pump COP 3.6 reflects hot water near 80 °C for CIP and washing, drawn from the carbonation and process chiller loop; COP falls as delivery temperature rises. Tariffs, fuel prices and COP vary by site and are replaced with metered values in the baseline.

Roadmap/ from baseline to proof

Baseline.
Electricity. Heat.
Proof.

01

BaselineWeeks 1–4

Bills, load survey, fuel and steam records, portable heat metering on candidate processes, ESG data map.

Signed-off energy, heat and carbon baseline
02

RoadmapWeeks 4–8

RE-100 electricity plan, heat pump shortlist for CIP, washing and pasteurisation, and the ESG data map — in one business case.

One business case — electricity, heat, ESG
03

Meter and logWeeks 6–12

ABT metering at the incomer and data loggers on electricity, heat, fuel and water lines — the measured base every later step is sized, settled and reported on.

ergOS live on metered data
04

Electricity live~3 months after roadmap

Open access contracted and approved; rooftop solar and BESS where they fit; every source orchestrated against demand on ergOS.

Green electricity flowing
05

Heat livePilot, then scale

One heat pump on the chiller loop with a CIP hot-water store, metered on ergOS; then washers, pasteurisers and syrup.

Fuel displaced, measured on ergOS
06

Operate and discloseEvery block · every year

ergOS runs electricity and heat; esgOS publishes BRSR Core-format, CBAM, CDP and customer disclosures with an audit trail.

Assurance-ready numbers

We can fund it. You choose how. Each lever — electricity or heat — can be bought four ways, and the two levers can be bought differently.

Timelines indicative; confirmed after the baseline and dependent on state approvals and equipment lead times.

Questions/ asked most often

Before you
commit anything.

Does it replace my boiler?
For loads up to 120 °C, yes — as the primary heat source. The boiler usually stays on standby and for any loads above that range.
What if electricity is expensive?
Each kWh of electricity returns three to four kWh of heat, so heat costs roughly a third of the electricity price. On green open access, the carbon falls close to zero as well.
What does the site need?
Spare electrical capacity, space near the heat users and a steady heat demand. A hot-water store smooths peaks and lets the unit run in the cheapest blocks.
Is it proven?
It is the same refrigeration cycle as the chillers already on your site, run for heat. Industrial units are in service worldwide in food, chemicals, pharma and textiles.

In short/ Food & Beverages

The Food & Beverages playbook is jouleWise's typical engineering approach for beverage and bottling plants: chill it, heat it — on the same kwh.

One provider for green electricity, green heat and the data that proves both — from source water to CIP to the last case on the truck. For a bottler or beverage maker, carbon, water and plastic are now scored per litre by brand owners, retailers and regulators. Six pressures point at the same metered data. Almost every heat duty in a beverage plant sits below 100 °C: CIP, washing, syrup and pasteurisation. Heat pumps serve them on electricity — and the chillers cooling the product supply the heat.

What to take away

  • Heat duties and temperatures: Bottle washing 60–85 °C (heat pump); CIP of syrup and filler lines 70–85 °C (heat pump); Syrup dissolving 60–85 °C (heat pump); Tunnel pasteurisation 60–75 °C (heat pump); Hot fill and flash pasteurisation 72–95 °C (heat pump); Crate and case washing 50–70 °C (heat pump); UHT processing 135–145 °C (stays on fuel).
  • PNG-fired boiler: ₹6.22 per kWh of useful heat, 0.221 kg CO₂/kWh-th
  • Diesel (HSD) boiler: ₹10.59 per kWh of useful heat, 0.315 kg CO₂/kWh-th
  • Heat pump on DISCOM electricity: ₹2.36 per kWh of useful heat, 0.199 kg CO₂/kWh-th
  • Heat pump on green open access: ₹1.53 per kWh of useful heat, 0.000 kg CO₂/kWh-th
  • Heat pump in solar blocks + store: ₹1.11 per kWh of useful heat, 0.000 kg CO₂/kWh-th
  • Plant areas with a lever: CIP and bottle wash, Pasteurisation, Syrup room, Chiller heat recovery, Cold store and dispatch.

What it assumes

  • Illustrative only, not an offer. Assumptions: PNG 10.4 kWh/SCM, 1.95 kg CO₂/SCM; HSD 10.0 kWh/L, 2.68 kg CO₂/L; grid 0.716 kg CO₂/kWh (CEA baseline order of magnitude); green electricity treated as zero-emission on a market basis with green attributes retired. Heat pump COP 3.6 reflects hot water near 80 °C for CIP and washing, drawn from the carbonation and process chiller loop; COP falls as delivery temperature rises. Tariffs, fuel prices and COP vary by site and are replaced with metered values in the baseline.
  • Timelines indicative; confirmed after the baseline and dependent on state approvals and equipment lead times.
Reviewed 2026-10-08 · jouleWisePlain-text version

Start/ Food & Beverages

Tell us the plant.
We'll map the stack.

Send one year of electricity bills and fuel records. We return the baseline, the electricity-and-heat roadmap and the business case.

This presentation is issued for discussion purposes only. Prices, durations, heat pump performance and outcomes shown are indicative, depend on site, state, load profile, process temperatures, contracted terms, exchange prices and the regulatory orders in force, and do not constitute an offer, warranty or commitment by jouleWise. Screens and plant illustrations are illustrative. Client names are cited from jouleWise assignments. Any engagement is governed solely by definitive agreements between the parties.