jouleWise

Automotive/ electricity · heat · proof

Two energy bills.
One plan to cut both.

One provider for green electricity, green heat and the data that proves both — from press shop to paint shop to dispatch.

Electricity · Haryana24% lower

About ₹6.08 a unit across the year with solar and wind, against ₹7.96 from the grid.

Heat · COP 4₹1.21 / kWh

Heat from a heat pump on that electricity, against ₹6.22 from a PNG boiler.

Start4 weeks

An energy assessment on your bills and metering, then one business case for electricity and heat.

Why nowOEM supplier targets · Exports and CBAM · Energy cost · Disclosure · Electrification · Carbon markets

Illustrative reference plant; your figures come from your own tariff, fuel and load.

ELECTRICITYGREEN SUPPLYHEATHEAT PUMPSDATAergOSESGesgOS

Press to dispatch/ where we intervene

Every shop
has a lever.

Coils arrive, presses stamp, robots weld, the paint shop heats and cools, assembly builds, carriers leave. jouleWise acts at ten points across the plant — four layers, one plan.

01020304050607080910
ElectricityHeatData · ergOSESG · esgOS
01

Green sourcing

Intrastate and ISTS solar and wind contracted through open access, routed for the lowest landed cost.

Electricity
02

Connectivity and metering

Open access approvals, connection agreement and ABT metering at the plant incomer.

Electricity
03

Rooftop solar

Press and body shop roofs carry behind-the-meter solar, sized from measured load.

Electricity
04

Battery storage

LFP storage moves midday solar into the evening shift and shaves peak demand.

Electricity
05

Heat pumps on pretreatment

Degreasing and conversion baths heated by heat pumps instead of PNG or diesel burners.

Heat
06

Thermal storage

Hot water store charged in solar blocks, drawn across all shifts.

Heat
07

Waste heat recovery

Compressor-house and chiller-condenser heat lifted back to process temperature.

Heat
08

ergOS control

15-minute metering of electricity, heat, fuel and water; forecasting, trading and heat dispatch.

Data · ergOS
09

Inbound steel and aluminium

Supplier data and embedded emissions for Scope 3 and CBAM reporting.

ESG · esgOS
10

Outbound and customers

Per-part carbon, OEM questionnaires and BRSR Core-format disclosure from esgOS.

ESG · esgOS

Illustrative plant. Actual intervention map built site by site in the baseline.

Electricity/ plan · implement · meter · orchestrate

Low-cost
green electricity.

Presses, welding lines, compressed air and paint-shop HVAC set a two- or three-shift load. We build the green portfolio to that profile — and move heat pump load into the solar hours, where green electricity is cheapest.

Every source, one dispatch. Intrastate and ISTS solar and wind, rooftop solar, BESS and green-market purchase — each source orchestrated to fulfil industrial demand at least cost.
000612182424 HOURS · 96 BLOCKS · ILLUSTRATIVEHEAT PUMPS · PAINT SHOP PRETREATMENT AND WASHERSSOLARWIND · ISTSBESSGREEN MARKETFACTORY + HEAT PUMPS
Wind · ISTSSolarBESSGreen marketHeat pump load

Hover the profile to read any 15-minute block

Two shifts, with the paint shop as the heat load: pretreatment baths and washers held at temperature from the first shift to the last. The store is brought up before the morning shift, in the cheapest blocks, so the day starts without the boiler.

01

Plan

Meter-data due diligence: bills, load survey, rooftop and captive parameters. Solar, wind, hybrid, BESS and exchange electricity optimised together, capex or opex, with each state's ToD, banking and open access charges in the landed-cost model.

RE-100 roadmap · size, location, savings, NPV
02

Implement

RfP over a 25-year horizon, developer evaluation, reverse auction, PPA and shareholder agreements (26% SPV equity for captive status), open access approvals and connection agreement.

Green electricity contracted · ~3 months once planning closes
03

Meter and log

ABT meters at injection and drawal points — main and check meters on CTs and PTs of the required accuracy class — plus data loggers on every incomer, heat pump, steam, fuel and water line. Installed, tested, sealed and linked to the SLDC and to ergOS.

Every source and load visible in 15-minute blocks
04

Orchestrate

ergOS forecasts 96 blocks, schedules with the SLDC, trades DAM, GDAM, RTM and GTAM, manages banking and battery health — and now dispatches heat pumps and thermal storage against price.

For the life of the assets

Heat/ what moves, what stays

The boiler,
reinvented.

Most paint-shop heat is low-temperature: cleaning baths, conversion coating, booth air and washers sit well below 120 °C. Industrial heat pumps serve those loads with electricity — so as electricity gets cheaper and greener, so does every unit of heat.

Pretreatment degreasingalkaline cleaning baths
Conversion coatingzirconium or phosphate
ED bath and rinsescooling the bath, heating rinse water
Paint booth airheating and humidity control
Parts washersmachining and assembly lines
Canteen and hot waterkitchens, showers, laundry
Sealer and PVC ovensremain on existing burners
ED and topcoat ovensremain on existing burners
0 °C50100120150200 °C
Heat pump rangeStays on existing burners or electrode heat120 °C ceiling

Heat sources we reuse

Compressed-air compressors, ED bath and chiller condensers, oven and booth exhaust — heat you already pay for, lifted back to process temperature.

Heating and cooling at once

The ED bath and paint-shop HVAC need cooling while pretreatment needs heat. One heat pump serves both — the cooling load becomes the heat source.

Sized from metered heat

Portable heat meters log flow and temperature on candidate processes for two to four weeks before anything is sized.

Economics/ illustrative

Low-cost electricity
drives low-cost heat.

What one kWh of useful process heat costs, and what it emits, depending on where the heat comes from. The heat pump cuts cost on any electricity; green electricity is what cuts the carbon.

Source of heat
₹ per kWh of useful heat
₹/kWh-th
PNG-fired boiler₹55/SCM · 85% efficiency
6.22
Diesel (HSD) boiler₹90/L · 85% efficiency
10.59
Heat pump on DISCOM electricity₹8.5/kWh · COP 4.0
2.12
Heat pump on green open access₹5.5/kWh landed · COP 4.0
1.38
Heat pump in solar blocks + store₹4.0/kWh · COP 4.0
1.00
Source of heat
kg CO₂ per kWh of useful heat
kg/kWh-th
PNG-fired boiler
0.22
Diesel (HSD) boiler
0.32
Heat pump on DISCOM electricity
0.18
Heat pump on green open access
≈ 0
Heat pump in solar blocks + store
≈ 0

Illustrative only, not an offer. Assumptions: PNG 10.4 kWh/SCM, 1.95 kg CO₂/SCM; HSD 10.0 kWh/L, 2.68 kg CO₂/L; grid 0.716 kg CO₂/kWh (CEA baseline order of magnitude); green electricity treated as zero-emission on a market basis with green attributes retired. Heat pump COP 4.0 reflects hot water near 60 °C for pretreatment, lifted from compressor and chiller waste heat; COP falls as delivery temperature rises. Tariffs, fuel prices and COP vary by site and are replaced with metered values in the baseline.

Roadmap/ from baseline to proof

Baseline.
Electricity. Heat.
Proof.

01

BaselineWeeks 1–4

Bills, load survey, fuel and steam records, portable heat metering on candidate processes, ESG data map.

Signed-off energy, heat and carbon baseline
02

RoadmapWeeks 4–8

RE-100 electricity plan, heat pump shortlist for pretreatment, washers and hot water, and the ESG data map — in one business case.

One business case — electricity, heat, ESG
03

Meter and logWeeks 6–12

ABT metering at the incomer and data loggers on electricity, heat, fuel and water lines — the measured base every later step is sized, settled and reported on.

ergOS live on metered data
04

Electricity live~3 months after roadmap

Open access contracted and approved; rooftop solar and BESS where they fit; every source orchestrated against demand on ergOS.

Green electricity flowing
05

Heat livePilot, then scale

One heat pump and thermal store on pretreatment, metered on ergOS; then washers, booth air and hot water across shops.

Fuel displaced, measured on ergOS
06

Operate and discloseEvery block · every year

ergOS runs electricity and heat; esgOS publishes BRSR Core-format, CBAM, CDP and customer disclosures with an audit trail.

Assurance-ready numbers

We can fund it. You choose how. Each lever — electricity or heat — can be bought four ways, and the two levers can be bought differently.

Timelines indicative; confirmed after the baseline and dependent on state approvals and equipment lead times.

Questions/ asked most often

Before you
commit anything.

Does it replace my boiler?
For loads up to 120 °C, yes — as the primary heat source. The boiler usually stays on standby and for any loads above that range.
What if electricity is expensive?
Each kWh of electricity returns three to four kWh of heat, so heat costs roughly a third of the electricity price. On green open access, the carbon falls close to zero as well.
What does the site need?
Spare electrical capacity, space near the heat users and a steady heat demand. A hot-water store smooths peaks and lets the unit run in the cheapest blocks.
Is it proven?
It is the same refrigeration cycle as the chillers already on your site, run for heat. Industrial units are in service worldwide in food, chemicals, pharma and textiles.

In short/ Automotive

The Automotive playbook is jouleWise's typical engineering approach for automotive plants: two energy bills. one plan to cut both.

One provider for green electricity, green heat and the data that proves both — from press shop to paint shop to dispatch. For a vehicle or component maker, decarbonisation has moved from a CSR line to a sourcing condition. Six pressures point at the same metered data. Most paint-shop heat is low-temperature: cleaning baths, conversion coating, booth air and washers sit well below 120 °C. Industrial heat pumps serve those loads with electricity — so as electricity gets cheaper and greener, so does every unit of heat.

What to take away

  • Heat duties and temperatures: Pretreatment degreasing 45–60 °C (heat pump); Conversion coating 30–55 °C (heat pump); ED bath and rinses 28–35 °C (heat pump); Paint booth air 20–30 °C (heat pump); Parts washers 50–80 °C (heat pump); Canteen and hot water 55–65 °C (heat pump); Sealer and PVC ovens 130–160 °C (stays on fuel); ED and topcoat ovens 140–190 °C (stays on fuel).
  • PNG-fired boiler: ₹6.22 per kWh of useful heat, 0.221 kg CO₂/kWh-th
  • Diesel (HSD) boiler: ₹10.59 per kWh of useful heat, 0.315 kg CO₂/kWh-th
  • Heat pump on DISCOM electricity: ₹2.12 per kWh of useful heat, 0.179 kg CO₂/kWh-th
  • Heat pump on green open access: ₹1.38 per kWh of useful heat, 0.000 kg CO₂/kWh-th
  • Heat pump in solar blocks + store: ₹1.00 per kWh of useful heat, 0.000 kg CO₂/kWh-th
  • Plant areas with a lever: Pretreatment baths, Paint-shop washers, Compressed-air heat recovery, Chiller heat recovery, Shift-profile electricity.

What it assumes

  • Illustrative only, not an offer. Assumptions: PNG 10.4 kWh/SCM, 1.95 kg CO₂/SCM; HSD 10.0 kWh/L, 2.68 kg CO₂/L; grid 0.716 kg CO₂/kWh (CEA baseline order of magnitude); green electricity treated as zero-emission on a market basis with green attributes retired. Heat pump COP 4.0 reflects hot water near 60 °C for pretreatment, lifted from compressor and chiller waste heat; COP falls as delivery temperature rises. Tariffs, fuel prices and COP vary by site and are replaced with metered values in the baseline.
  • Timelines indicative; confirmed after the baseline and dependent on state approvals and equipment lead times.
Reviewed 2026-10-08 · jouleWisePlain-text version

Start/ Automotive

Tell us the plant.
We'll map the stack.

Send one year of electricity bills and fuel records. We return the baseline, the electricity-and-heat roadmap and the business case.

This presentation is issued for discussion purposes only. Prices, durations, heat pump performance and outcomes shown are indicative, depend on site, state, load profile, process temperatures, contracted terms, exchange prices and the regulatory orders in force, and do not constitute an offer, warranty or commitment by jouleWise. Screens and plant illustrations are illustrative. Client names are cited from jouleWise assignments. Any engagement is governed solely by definitive agreements between the parties.